News & insights

News & insights

Production, standards, logistics and exhibitions — plus the selection notes our engineers keep repeating to buyers.

12articles
4categories
304 vs 316L: when 316L is actually required
2026-10-18

304 vs 316L: when 316L is actually required

The gap is 30–40%, but choosing wrong costs far more. A decision line by medium, chloride and temperature.

Read more
Industry
2B, BA, No.1, HL, 8K: choosing a stainless finish
2026-10-14

2B, BA, No.1, HL, 8K: choosing a stainless finish

Finish decides corrosion resistance and processing cost, not just appearance. Comparison table plus traps.

Read more
Industry
Stainless thickness tolerance: A480 vs EN 10088-2
2026-10-10

Stainless thickness tolerance: A480 vs EN 10088-2

A “1.5 mm” sheet may measure 1.35 or 1.62 — how to specify acceptance.

Read more
Industry
Exporting stainless: HS codes, origin certificates and customs
2026-10-06

Exporting stainless: HS codes, origin certificates and customs

Coil and sheet can fall under different codes, and the code drives duty and anti-dumping.

Read more
Notice
2205 duplex vs 316L: PREN and when to switch
2026-10-02

2205 duplex vs 316L: PREN and when to switch

Where 316L fails in chloride service, and what 2205 really costs in welding and forming.

Read more
Industry
Coil, sheet or circle: the real cost of decoiling and slitting
2026-09-28

Coil, sheet or circle: the real cost of decoiling and slitting

Processing fee and edge trim decide which form to order for the same tonne.

Read more
Industry
Annual maintenance completed — lead times back to normal
2026-10-09

Annual maintenance completed — lead times back to normal

Standard sizes in stock; reference lead time 20–30 days, confirmed per order.

Read more
Company
Dual-standard certificates: ASTM A240 and EN 10088-2
2026-10-02

Dual-standard certificates: ASTM A240 and EN 10088-2

Cold and hot rolled now meet both US and EU standards, with 3.1 certificates per order.

Read more
Industry
New direct sailings to Jebel Ali and Ho Chi Minh
2026-09-22

New direct sailings to Jebel Ali and Ho Chi Minh

Arrival 3–5 days faster for Middle East and Southeast Asia, CIF / CFR available.

Read more
Notice
Canton Fair 138th session — recap, booth 12.2J38
2026-09-15

Canton Fair 138th session — recap, booth 12.2J38

The 15–19 October session has closed; next booth details will be posted here.

Read more
Exhibition
No.4 finishing line commissioned, slitting capacity +30%
2026-09-05

No.4 finishing line commissioned, slitting capacity +30%

Minimum slit width 8 mm; monthly capacity up about 30%.

Read more
Company
CBAM transitional period: reporting notes for EU exports
2026-08-28

CBAM transitional period: reporting notes for EU exports

Quarterly embedded-emission reporting — the points we prepare for customers.

Read more
Industry

Need a quote or technical support?

Send the grade, size, quantity and destination port — we reply with FOB / CIF within 24 hours.

Added to inquiry list